Riverside HQ

Riverside Energy Systems

Battery Optimization Report

Battery Optimization Studio

Compare measured grid behaviour with proposed solar and battery scenarios.

Rate-aware hourly dispatch
Starting application…

1. Client and utility data

BC Hydro CSV / XLSX
Existing solar mode uses measured inflow and calculated exports from the utility file.
Time-of-day windows: overnight discount from 11 p.m. to 7 a.m.; peak surcharge from 4 p.m. to 9 p.m. Basic daily charges are excluded because a battery does not materially change them. Tier allocation is estimated by billing cycle.
Upload hourly utility data
The importer looks for Interval Start Date/Time, Inflow (kWh), Outflow (kWh), and Net Consumption (kWh). It checks every worksheet.
Annual grid imports
—
Baseline billed imports
Annual grid exports
—
Available storage opportunity
Export hours
—
Hours with net export
Baseline energy cost
—
Energy charges less export credit

2. Energy story

Average grid imports and exports reveal when the existing solar system produces too early for the client’s load.
ColourMeaningInterpretation
PurpleGrid importEnergy purchased from the utility.
RedGrid exportSolar sent to the grid.
Battery chargeExport captured for later use.
Battery dischargeStored energy replacing grid imports.
Additional solarEstimated output from proposed expansion.

3. Side-by-side comparison

Recalculates as assumptions change
ScenarioImportsExportsEnergy costAnnual savingsPaybackGrid reductionAutonomy

4. BC Hydro rate comparison

Current system vs. 2-battery scenario
Rate planCurrent costWith batteryBattery savingsBest fit
Upload data to compare rate plans.