Battery Optimization Studio

Compare measured grid behaviour with proposed solar and battery scenarios.

Rate-aware hourly dispatch
Starting application…

1. Client and utility data

BC Hydro CSV / XLSX
Time-of-day windows: overnight discount from 11 p.m. to 7 a.m.; peak surcharge from 4 p.m. to 9 p.m. Basic daily charges are excluded because a battery does not materially change them. Tier allocation is estimated by billing cycle.
Upload hourly utility data
The importer looks for Interval Start Date/Time, Inflow (kWh), Outflow (kWh), and Net Consumption (kWh). It checks every worksheet.
Annual grid imports
Baseline billed imports
Annual grid exports
Available storage opportunity
Export hours
Hours with net export
Baseline energy cost
Energy charges less export credit

2. Energy story

Average grid imports and exports reveal when the existing solar system produces too early for the client’s load.
ColourMeaningInterpretation
PurpleGrid importEnergy purchased from the utility.
RedGrid exportSolar sent to the grid.
Battery chargeExport captured for later use.
Battery dischargeStored energy replacing grid imports.
Additional solarEstimated output from proposed expansion.

3. Side-by-side comparison

Recalculates as assumptions change
ScenarioImportsExportsEnergy costAnnual savingsPaybackGrid reductionAutonomy

4. BC Hydro rate comparison

Current system vs. 2-battery scenario
Rate planCurrent costWith batteryBattery savingsBest fit
Upload data to compare rate plans.